Asset challenge
Operational campus site; tight programme; high-level roof access.
A 3,900 m² roof overhaul completed in six weeks, with the repaired roof prepared to receive photovoltaic solar panels. The published scope also included expansion-joint repair, re-insulation, new boards, waterproofing and 800 m² of protective coating to one side of the building.
Operational campus site; tight programme; high-level roof access.
Rope access, roof strip-out/reinstatement, waterproofing, joint repair and protective coating.
This work demonstrates Citi-Con’s ability to combine access, specialist repair and protection around live or technically demanding assets.